Posted: July 09, 2021
Rapid City
Agenda Item Summary

Agenda Item Ref. #: WS071421-10

Agenda Item Title:

Authorize staff to advertise for the E Main Street N Bridge Repair, Project No. 19-2525/ CIP 51247 for $1,300,000.

Origination Group:
City Council Working Session
Origination Meeting Date:
07/14/2021
City Council Hearing Date:
07/19/2021
Staff Contact:
Sara Odden
Location:
E Main Street N
Agenda Item Summary:
This project is a comprehensive rehabilitation project on an existing structure located on E Main Street N between Brennan Ave and Steele Ave. Bridge inspections have shown severe deterioration in the bent caps and the bridge deck, and this project will replace the bent caps and bridge deck. The existing bike lane and bike path that are on the existing structure will remain, with the addition of safety rails and a separation curb between the bike path and vehicular traffic. A 2019 Bridge Improvement Grant (BIG) was obtained from the SDDOT to cost-share the repair work on this structure. The grant reimburses 75% of the costs for design, construction and construction administration of the project, to a maximum of $553,500.00.

Funding Source & Fiscal Impact (if applicable):

Funding Cost Center
CIP-Streets 8910
Is Funding Budgeted?:
Budgeted

Recommendations:

Login Form

Joomla! Debug Console

Session

Profile Information

Memory Usage

Database Queries